AI infrastructure is entering a new era. Rack densities are moving from tens of kilowatts to hundreds of kilowatts. Power architectures are shifting from legacy 480 VAC to native 800 VDC.
Within the next year, leading GPU platforms will require approximately 600kW per rack, with roadmaps quickly pushing beyond 1.0MW per rack. Most data centers were never designed for this shift.
Our facilities are purpose-built to support 600kW to 1.0MW per rack using native 800VDC power architecture, on-site generation, and advanced liquid cooling.
NEO1 AI Factory architects, constructs, and operates next-generation AI factories purpose-built for the extreme power and cooling demands of future GPUs.
By integrating on-site power generation, liquid cooling, and DC-native electrical systems, we remove power as the primary constraint to AI innovation.
This is not traditional colocation.
This is infrastructure engineered for the future of compute.
Silver Creek is NEO1’s first hyperscale-class AI factory and the blueprint for all future deployments.
Silver Creek proves that AI infrastructure can scale with permanent off-grid power, higher efficiency, extreme density, and zero water consumption.
At NEO1, we are committed to enabling AI innovation through purpose-built infrastructure. Built by technologists, veterans, gamers, geeks, and operators, with a mission-driven mindset, NEO1 delivers the infrastructure foundation required to run next-generation AI at scale.
If you are a potential customer, vendor, or interested in partnering with us for referral, please reach out to our sales team and they can connect you with the appropriate person including members our executive team.
NEO1 AI Factory, Inc.
303 Twin Dolphin Drive #600
Redwood City, CA 94065